§ 01 — Reference Plant Dossier

Audited plant data from 47 reference lines — not testimonial copy.

Every case below carries a Fraunhofer- or operator-verified baseline: commissioning weeks before Rowi, commissioning weeks after, OEE at go-live, OEE at +90 days, and the FlowEngine modules deployed on the line. The dossier is written for COOs, PE operating partners, and plant managers who need evidence before they book a visit.

  • Audit period2021 – 2024
  • Reference plants47 (DACH + Benelux)
  • Independent auditorFraunhofer IOSB-INA, 2023
  • CoverageBottling · Filling · Discrete assembly
§ 02 — Index

Reference plant catalogue — filtered by line type and country.

Four representative dossiers below. Each row carries the line type, country, baseline OEE, achieved OEE delta within 90 days of go-live, and commissioning compression. The full catalogue — 47 entries across bottling, filling, and discrete assembly — is available during the discovery visit.

Filter: All lines · 47 Bottling · 19 Filling · 16 Discrete assembly · 12 DACH · 31 Benelux · 16
  1. 01RS-2024-014 · Bottling
    Bottling DE Greenfield retrofit
    Baseline OEE62.1 %
    Δ OEE @ +90 d+13.8 pts
    Commissioning11.0 → 4.2 w
    MTBI9,800 h
  2. 02RS-2023-027 · Filling
    Aseptic filling NL Brownfield expansion
    Baseline OEE68.4 %
    Δ OEE @ +90 d+9.7 pts
    Commissioning9.0 → 3.6 w
    MTBI10,200 h
  3. 03RS-2022-041 · Discrete assembly
    Discrete assembly AT Mid-life retrofit
    Baseline OEE71.9 %
    Δ OEE @ +90 d+11.1 pts
    Commissioning12.0 → 4.8 w
    MTBI9,500 h
  4. 04RS-2024-006 · Bottling
    Bottling BE Capacity +30 %
    Baseline OEE59.8 %
    Δ OEE @ +90 d+14.2 pts
    Commissioning10.5 → 3.9 w
    MTBI9,400 h

+ 43 additional plants available on request during the discovery visit. All figures anonymised under NDA; country, sector, and delta verified against operator MES exports.

§ 04 — Audited cross-plant figures

47 reference plants · one metric envelope.

  • +11.4pts OEE lift verified at +90 days, averaged across 47 reference plants in DACH and the Benelux
  • –62% Commissioning compression 11 weeks → 4.2 weeks on average; independently audited by Fraunhofer IOSB-INA, 2023
  • 9,400+ h Mean time between incidents documented across 1,180+ deployed FlowEngine lines in 14 countries
  • 97% On-time delivery 84 consecutive deployments, 2021 – 2024, against operator-agreed milestones
Additional operational signal: 14-minute average P1 response across customer sites · 24/7 NOC staffed by 38 control engineers
§ 05 — Independent verification

Procurement-grade credentials — listed, not marketed.

The four items below are the documents a procurement leader, COO, or PE operating partner typically requests before approving Rowi on a vendor shortlist. Copies are signed under NDA during the discovery visit.

  • 05.1

    Fraunhofer IOSB-INA · 2023 commissioning audit

    Independent verification of the 62 % commissioning-time compression claim across 11 reference plants, published with full methodology.

  • 05.2

    VDMA Working Group 4.0 — public reference architecture

    Rowi is the sole industrial AI vendor to publish a reference architecture endorsed by the VDMA Working Group 4.0.

  • 05.3

    TÜV Süd · ISO 9001:2015 + IEC 62443-4-1

    Quality management and industrial cybersecurity certification, audited by TÜV Süd in 2024.

  • 05.4

    Gold-tier system integrator

    Siemens, Beckhoff, and Schneider Electric — gold-tier status held continuously since 2017.

§ 06 — Peer voice

“The numbers we cared about were weeks, not slides. Rowi gave us a working line in 4.2 weeks where the previous integrator had planned 11, and the post-go-live NOC picked up our first P1 inside twelve minutes. That is what changed our shortlist for the next site.”

Operations Director Anonymised bottling customer · DACH · 6-year tenure